IT STARTS WITH RAIN

Rain in.
Every drop handled.

Underground water infrastructure for plants, civil works and municipal sites. One closed cycle below the surface — collected and stored, cleaned, delivered, returned to the earth.

BOTH SYSTEMS UNDER A WORKING PLANT YARD
↓ FOLLOW THE PIPE
The full cycle

One pipe. Four jobs.
Nothing wasted.

Every drop that lands on the site enters the same underground line — and leaves it either used, or given back to the ground. Open any stage for the detail.

↻ AND IT STARTS AGAIN WITH THE NEXT RAIN

Who does what in the cycle

Both products collect and store.
Then each plays to its strength.

Rainwater capture and storage is the shared job — AquaBox does it in a sealed cylinder, BlockTech in a membrane-lined crate field. After that they diverge.

AQUABOX — THE SEALED TANK

  • Collect & store — sealed modular cylinder, 10–120 m³ per body
  • Clean — sand + oil separation and sorption
  • Deliver — ready-to-install pumping station
  • Strength, sealing and built-in function — up to ~300 m³

BLOCKTECH — THE CRATE FIELD

  • Collect & store — membrane-lined build, 95% usable volume
  • Infiltrate — geotextile build returns water to the soil
  • Attenuate — buffers storm peaks under load-bearing yards
  • Cheap volume in any footprint — above ~300 m³
Container to complete — by hand

How the whole line goes in.

Every element is light enough to carry. No crane, no heavy plant — the line is built on a live industrial site and buried the same week.

Flat-packed
01 · ARRIVES FLAT-PACKED
Carried by hand
02 · CARRIED BY HAND
Snapped together
03 · SNAPS TOGETHER
Buried
04 · BURIED & INVISIBLE
Logistics

It ships like ordinary freight.

60 m³per 20′ container · AquaBox 120 m³per 40′ container · AquaBox 175 m³per euro-truck · AquaBox 300 m³in one truck · BlockTech
Curtain-side truck loaded with stacks of nested AquaBox half-shells, secured with lashing straps ONE TRUCK · NESTED HALF-SHELLS STANDARD CURTAIN-SIDER — NO PERMITS, NO PROJECT CARGO
FibreglassAQUATEX modular
Make time1 tank / 6–8 weeks5 × 60 m³ / day
TransportAssembled, oversized, permitsFlat-packed, standard container
InstallCrane + heavy machineryBy hand / forklift
QualityNo per-unit controlEvery part QC'd, repeatable
End of lifeLandfillRecyclable
From the field

Real sites. Real crews.

Photographs from live installations and the production floor — no renders.

BLOCKTECH - HILLSIDE SITE
BLOCKTECH · HILLSIDE SITEA terraced crate field going in below a residential slope — the reservoir follows the ground, not the other way round.
AQUABOX - PRODUCTION FLOOR
AQUABOX · PRODUCTION FLOORA whole tank's worth of nested half-shells moved on one forklift, straight off the moulding machine.
BLOCKTECH - YARD INSTALL
BLOCKTECH · YARD INSTALLCrate field laid out with the inspection chamber set in place, ready for the membrane wrap.
AQUABOX - MODULE, AS MOULDED
AQUABOX · MODULE, AS MOULDEDOne complete ring section — the repeating element the whole tank is built from.
BLOCKTECH - WINTER BUILD
BLOCKTECH · WINTER BUILDGeotextile going on at −20 °C. Three people, no crane, no cure time to wait out.
AQUABOX - NESTED FOR TRANSPORT
AQUABOX · NESTED FOR TRANSPORTSix shells stacked at the press — this is why 120 m³ fits in a 40′ container.
BLOCKTECH - MODULE DETAIL
BLOCKTECH · MODULE DETAILThe load-bearing cones that let the field carry a car park above it.
BLOCKTECH - CAPPED & READY
BLOCKTECH · CAPPED & READYLocking caps in, membrane folded back, backfill next.
01 / 08
Request a quote

Tell us your site and your volume.

We'll tell you the system and send back a specification and a price — an engineer reading your requirement, not a checkout.

REQUEST A QUOTE →